NASA Seeks ULA Rocket Components Amid Cost Overruns
Written by Emily J. Thompson, Senior Investment Analyst
Updated: Mar 05 2026
0mins
Should l Buy BA?
Source: Benzinga
- Cost Overruns: NASA's Exploration Upper Stage, built by Boeing, has exceeded $2.8 billion and is facing delays, prompting the agency to seek alternative solutions to manage its budget effectively.
- Alternative Solution Exploration: NASA plans to use the ULA-built Centaur V rocket for lunar missions, which utilizes the same propellant as the SLS, although this plan is not yet finalized.
- Artemis II Delay: The launch of NASA's Artemis II vehicle has been postponed due to rocket issues, with the SLS vehicle rolled back from the launch pad at Kennedy Space Center in Florida after engineers noted an
Trade with 70% Backtested Accuracy
Stop guessing "Should I Buy BA?" and start using high-conviction signals backed by rigorous historical data.
Sign up today to access powerful investing tools and make smarter, data-driven decisions.
Analyst Views on BA
Wall Street analysts forecast BA stock price to rise
16 Analyst Rating
14 Buy
1 Hold
1 Sell
Strong Buy
Current: 223.380
Low
150.00
Averages
269.14
High
298.00
Current: 223.380
Low
150.00
Averages
269.14
High
298.00
About BA
The Boeing Company is an aerospace company. Its segments include Commercial Airplanes (BCA), Defense, Space & Security (BDS), and Global Services (BGS). Its BCA segment develops, produces and markets commercial jet aircraft principally for the commercial airline industry worldwide. Its family of commercial jet aircraft in production includes the 737 narrow-body model and the 767, 777 and 787 wide-body models. Its BDS segment is engaged in the research, development, production and modification of manned and unmanned military aircraft and weapons systems for strike, surveillance and mobility. Its BGS segment provides services to its commercial and defense customers worldwide. It sustains aerospace platforms and systems with a range of products and services, including supply chain and logistics management, engineering, maintenance and modifications, upgrades and conversions, spare parts, pilot and maintenance training systems and services, technical and maintenance documents, and others.
About the author

Emily J. Thompson
Emily J. Thompson, a Chartered Financial Analyst (CFA) with 12 years in investment research, graduated with honors from the Wharton School. Specializing in industrial and technology stocks, she provides in-depth analysis for Intellectia’s earnings and market brief reports.
- Fleet Expansion Plan: Ethiopian Airlines has announced the purchase of six 787-9 Dreamliner jets, fully exercising commitments from its landmark 2023 order, aiming to enhance its international network coverage through increased long-haul flights, which is expected to significantly boost the company's competitiveness in the global aviation market.
- Cargo Capacity Enhancement: The newly acquired 787-9 aircraft will enhance the airline's cargo capacity to meet the rising demand for long-haul travel, further driving business growth in the international cargo market and increasing overall revenue.
- Commitment to Operational Excellence: Ethiopian Airlines CEO Mesfin Tasew stated that this order reflects the company's sustainable growth and readiness for future achievements, indicating its dedication to improving operational efficiency and passenger comfort through a modernized fleet.
- Leadership in African Aviation: As Africa's largest operator of the 787 Dreamliner, Ethiopian Airlines currently operates over 170 modern, environmentally friendly aircraft covering 145 global destinations, solidifying its leadership position in the African aviation market and laying the groundwork for future growth.
See More
- Defense Budget Surge: The Trump administration has requested $200 billion from Congress for the Iran war, alongside plans to increase the 2027 military budget from $1 trillion to $1.5 trillion, which is expected to significantly boost investment interest in the defense sector.
- Palantir's Revenue Growth: Palantir Technologies reported fourth-quarter revenue of $1.4 billion, a 70% increase year-over-year, with U.S. government revenue reaching $570 million, up 66%, highlighting strong demand and market position in military data analytics.
- AeroVironment's New Product Launch: AeroVironment's recently announced Mayhem 10 unmanned system boasts a range of 62 miles and a 10-pound payload, with the CEO stating it sets a new standard for operational versatility and survivability on the modern battlefield, contributing to a 143% revenue increase to $408 million in Q3 of fiscal 2026.
- ETF Investment Opportunity: The Invesco Aerospace & Defense ETF tracks the Spade Defense Index with $8.3 billion in assets under management and an expense ratio of 0.58%, providing investors with a convenient way to capitalize on rising defense spending while ensuring portfolio diversification.
See More
- Increased Defense Budget: The Trump administration's request for $200 billion to finance the war in Iran, alongside a proposed increase of the military budget from $1 trillion to $1.5 trillion by 2027, is expected to significantly boost demand for defense contractors.
- Palantir Revenue Surge: Palantir reported $1.4 billion in revenue for Q4, a 70% increase year-over-year, with U.S. government revenue reaching $570 million, up 66%, highlighting its strong performance and demand in military data analytics.
- AeroVironment Product Launch: AeroVironment's recent introduction of the Mayhem 10 unmanned system, capable of 62 miles range and 10-pound payload, sets a new standard for operational versatility and survivability on the modern battlefield, likely enhancing its competitive edge.
- ETF Investment Opportunity: The Invesco Aerospace & Defense ETF, with $8.3 billion in assets and an expense ratio of 0.58%, offers investors a convenient way to capitalize on rising defense spending while ensuring diversification through its market-cap-weighted structure that limits exposure to any single stock.
See More
- Order Confirmation: Ethiopian Airlines has officially confirmed the purchase of six Boeing 787-9 Dreamliners, fully exercising commitments from its landmark 2023 order, which underscores its commitment to sustainable growth and is expected to enhance its international route network.
- Cargo Capacity Enhancement: The newly acquired 787-9s will be utilized to expand the intercontinental network from Addis Ababa and increase cargo capacity to meet the rising demand for long-haul travel, thereby strengthening the airline's competitive position in the global aviation market.
- Fleet Modernization: By introducing the ultra-modern 787-9 aircraft, Ethiopian Airlines is further enhancing operational excellence and passenger comfort, solidifying its status as the operator of Africa's largest fleet of 787 Dreamliners, which is expected to attract more passengers and improve service quality.
- Global Influence: Ethiopian Airlines currently serves over 145 global destinations and operates more than 170 modern, environmentally friendly aircraft, continuing to drive air connectivity between Africa and the rest of the world, showcasing its strength as a leading aviation group in Africa.
See More

Ethiopian Airlines Fleet Update: Ethiopian Airlines has converted options for six Boeing 787 Dreamliner aircraft into firm orders, enhancing its fleet capabilities.
Expansion Strategy: This move is part of Ethiopian Airlines' broader strategy to expand and modernize its fleet to meet growing demand in the aviation market.
See More
- Market Capitalization Comparison: A comparative analysis of Analog Devices Inc (ADI) and Boeing Co (BA) reveals that ADI's market cap stands at $181.34 billion, while BA's is at $175.43 billion, highlighting their relative size differences within the S&P 500 and influencing investor perceptions of value.
- Investor Misconceptions: Many novice investors mistakenly believe that a higher stock price indicates greater company value, but market capitalization provides a true value comparison, helping investors accurately assess companies and avoid misguided investment decisions based on stock price alone.
- Fund Investment Strategies: Market capitalization determines a company's size tier among peers, impacting mutual funds and ETFs' investment choices; for instance, large-cap funds may focus solely on companies valued over $10 billion, thereby affecting the attractiveness of both ADI and BA.
- Market Performance Dynamics: As of Monday's close, ADI's stock rose approximately 2.5%, while BA increased about 0.7%, reflecting differing investor sentiments and expectations towards the two companies, which may influence future capital flows and stock price trends.
See More










