Sprott Silver ETF Underperforms with 5.3% Drop
Written by Emily J. Thompson, Senior Investment Analyst
Updated: Mar 13 2026
0mins
Should l Buy CIFR?
Source: NASDAQ.COM
- ETF Performance: The Sprott Silver Miners & Physical Silver ETF dropped approximately 5.3% in Friday afternoon trading, indicating a weak market performance that could undermine investor confidence and lead to capital outflows.
- Weak Stock Components: Among the ETF's weakest performers were Avino Silver & Gold Mines, down about 7.2%, and Americas Gold and Silver, down about 7%, reflecting broader pressures within the silver mining sector.
- Market Reaction: The decline in the silver ETF may prompt investors to reassess their allocations within precious metals portfolios, potentially affecting the liquidity and market sentiment surrounding related stocks.
- Industry Outlook: The ongoing slump in silver mining stocks may signal greater challenges for the industry in the current market environment, necessitating investor vigilance regarding future market dynamics and policy changes.
Trade with 70% Backtested Accuracy
Stop guessing "Should I Buy CIFR?" and start using high-conviction signals backed by rigorous historical data.
Sign up today to access powerful investing tools and make smarter, data-driven decisions.
Analyst Views on CIFR
Wall Street analysts forecast CIFR stock price to rise
9 Analyst Rating
9 Buy
0 Hold
0 Sell
Strong Buy
Current: 18.000
Low
18.00
Averages
25.75
High
30.00
Current: 18.000
Low
18.00
Averages
25.75
High
30.00
About CIFR
Cipher Mining Inc. is focused on the development and operation of industrial-scale data centers for bitcoin mining and high-performance computing (HPC) hosting. The Company operates two wholly owned bitcoin mining data centers, a 207 megawatts (MW) site located in Odessa, Texas that draws fixed priced power from a power purchase agreement with its electricity provider (the Odessa Facility), and a 300 MW data center in Wink, Texas, of which 150 MW is operational as a bitcoin mining data center, that draws power from the power grid (the Black Pearl Facility), and has equity investments in three partially-owned 40 MW bitcoin mining data centers. Its development pipeline totals approximately 3.4 gigawatts (GW) across eight sites. The Odessa Facility is an approximately 52-acre site, located next to a natural gas power production facility. Through a subsidiary, it is in the process of constructing a data center for HPC near Colorado City, Texas (the Barber Lake Facility).
About the author

Emily J. Thompson
Emily J. Thompson, a Chartered Financial Analyst (CFA) with 12 years in investment research, graduated with honors from the Wharton School. Specializing in industrial and technology stocks, she provides in-depth analysis for Intellectia’s earnings and market brief reports.
- Mining Capacity Expansion: Canaan Inc. added over 10 MW of power capacity in North America, bringing its global installed capacity to 266.3 MW, thereby enhancing its competitive edge in the cryptocurrency mining market, particularly amid a decline in Bitcoin's network hashrate.
- Record Cryptocurrency Reserves: The company mined 89 BTC in March, increasing its total cryptocurrency treasury to a record high of 1,808 BTC and 3,952 ETH, reflecting its stable performance and growth potential amidst market volatility.
- Management Share Purchases: Chairman and CEO Nangeng Zhang and CFO Jin Cheng purchased 1,456,547 ADSs at an average price of $0.51 per ADS, further aligning management with shareholder interests and demonstrating confidence in the company's long-term strategy.
- Strategic Acquisition: Canaan acquired a 49% stake in Cipher Mining's projects in Texas for approximately $39.75 million, adding about 4.4 EH/s of operational hashrate, which strengthens its strategic position in energy optimization and grid stability.
See More
- Capacity Expansion: Canaan Inc. added over 10 MW of power capacity in North America, bringing its total global installed capacity to 266.3 MW, thereby enhancing its competitive position in the cryptocurrency mining market amid a decline in Bitcoin's network hashrate.
- Record Cryptocurrency Reserves: The company mined 89 BTC in March, increasing its total cryptocurrency treasury to a record high of 1,808 BTC and 3,952 ETH, reflecting its stable performance and growth potential in a volatile market.
- Enhanced Miner Efficiency: Canaan's average miner efficiency in North America improved to 18.7 J/TH, demonstrating strict operational and cost management, which is expected to further enhance profitability and market share.
- Strategic Investment: By acquiring a 49% stake in Cipher Mining's projects in Texas, Canaan has strengthened its capabilities in energy optimization and grid stability, which is anticipated to drive future business growth and market expansion.
See More
- Massive Investment Scale: Amazon's announcement of a $25 billion investment in Mississippi for data centers, alongside Alphabet's $40 billion plan in Texas, underscores the increasing commitment of tech giants to AI data centers.
- Project Delay Issues: Despite the influx of capital, half of U.S. data center projects face delays or cancellations due to supply shortages and reliance on Chinese imports, which not only hampers new developments but also enhances the value of existing data centers.
- IREN's Energy Advantage: IREN has secured over 4.5 gigawatts of renewable energy for its AI data centers and signed a five-year, $9.7 billion agreement with Microsoft, showcasing its competitive edge in energy procurement and likely attracting more contracts from tech giants.
- Nebius's Growth Potential: Nebius expects to exceed 3 gigawatts of contracted power by the end of 2026 and aims for $9 billion in annual recurring revenue, with a recent $27 billion contract with Meta Platforms further solidifying its market position in the AI sector.
See More
- Cipher Digital Growth Potential: Cipher Digital (CIFR) has seen its stock rise over 500% in the past year, despite a 32% decline year-to-date; its 15-year, $5.5 billion contract with Amazon Web Services to provide 300 megawatts of capacity underscores its pivotal role in AI data center construction and future growth prospects.
- Caterpillar Demand Surge: Caterpillar (CAT) benefits from the AI buildout, with power generation sales up 44% year-over-year in Q1 2023, driving a 17% growth in its Energy & Transportation segment, indicating strong performance in meeting the demands of AI data centers.
- Argan Order Backlog Increase: Argan (AGX) has secured a $2.9 billion backlog due to AI construction, more than doubling its $1.4 billion backlog from fiscal 2025, reflecting robust demand in renewable energy while facing the challenge of upgrading 104 gigawatts of aging power plants by 2030.
- Optimistic Market Outlook: Despite market volatility, investors can capitalize on long-term growth opportunities by focusing on high-quality companies like Cipher Digital, Caterpillar, and Argan, particularly in the context of ongoing investments in AI and renewable energy sectors.
See More
- Market Share Growth: Cipher Digital continues to expand its market share in the AI sector, with stock down 32% year-to-date but still up over 500% in the past year, indicating strong potential in a rapidly growing industry despite macroeconomic pressures.
- Major Contract Signing: The company signed a 15-year, $5.5 billion contract with Amazon Web Services to provide 300 megawatts of power capacity, highlighting its critical role in AI data center construction, while also securing a 200-megawatt site in Ohio.
- Caterpillar's Growth Drivers: Caterpillar's Power & Energy segment saw a 44% year-over-year increase in power generation sales in Q4, with overall segment growth of 37%, demonstrating strong support for energy demand driven by AI construction, despite a broader market correction.
- Argan's Backlog Surge: Argan's backlog reached $2.9 billion at the end of FY26, more than doubling from FY25, reflecting urgent needs for upgrading aging power assets, with 104 gigawatts expected to retire by 2030, driving future construction demand.
See More
- Strategic Shift: MARA Holdings is transitioning from a pure Bitcoin miner to an energy and digital infrastructure company, planning to lay off approximately 15% of its workforce to optimize resource allocation and adapt to new market demands.
- Layoff Impact: The layoffs affect multiple departments, with impacted employees receiving one month of paid leave and 13 weeks of severance pay, reflecting the company's relative care for its staff despite the industry's general lack of support.
- Bitcoin Sale: Between March 4 and March 25, MARA sold 15,133 BTC for approximately $1.1 billion, primarily using the proceeds to repurchase $1 billion of convertible senior notes, enhancing financial flexibility.
- Financial Pressure: MARA reported a staggering loss of approximately $1.7 billion in Q4 2025, with revenue declining 6% despite increased hashrate, highlighting the harsh economic conditions facing the mining industry.
See More











