Loading...

Intellectia LogoIntellectia
AI Trading Bot
Features
Markets
News
Resources
Pricing
Get Started
  1. Home
  2. Stock
  3. ELOG
ELOG logo

ELOG News & Events

-
$
0.000
0.000(0.000%)
At close
0.000(0.000%)Aft-market
ET
$
0.000
0.000(0.000%)
At close
0.000(0.000%)Aft-market
ET
OverviewStock Price PredictionTechnicalValuationFinancialsEarningsShould I BuyNews & Events
an image of Intellectia Logoan image of Intellectia

Most Trusted AI Platform for Winning Trades

TwitterYoutubeQuoraDiscordLinkedinTelegram

Copyright © 2026 Intellectia.AI. All Rights Reserved.

Company

  • Home
  • Contact
  • About Us
  • Press
  • Privacy
  • Terms of Service
  • Service Terms of Use

Resources

  • Blog
  • Tutorial
  • Help Center
  • Affiliate Program

Markets

  • Market Analysis
  • Crypto
  • Featured Screeners
  • AI Earnings Calendar
  • Market Movers
  • Stock Monitor
  • Economic Calendar
  • All US Stocks
  • All Cryptos

Tools

  • Dividend Calculator
  • Dividend Yield Calculator
  • Options Profit Calculator

Features

  • QuantAI Alpha Pick
  • SwingMax Portfolio
  • Swing Trading
  • AI Stock Picker
  • Whales Auto Tracker
  • Daytrading Center
  • Patterns Detection
  • AI Screener
  • Financial AI Agent
  • Backtesting Playground
  • AI Earnings Prediction
  • Stock Monitor
  • Technical Analysis

News

  • Overview
  • Top News
  • Daily Market Brief
  • Earnings Analysis
  • Newswire
  • Stock News
  • Crypto News
  • Institution News
  • Congress News
  • Monitor News

Compare

  • TradingView
  • SeekingAlpha
Intellectia

ELOG News

Eastern International Secures Wind Power Project Bids

Jan 26 2026PRnewswire

Eastern International Secures Wind Power Project Bids

Jan 26 2026Newsfilter

Eastern International Completes Wind Farm Projects with Total Contract Value Exceeding RMB 49 Million

Jan 14 2026PRnewswire

Eastern International Completes Offshore Wind Projects with Total Contract Value Exceeding RMB 49 Million

Jan 14 2026Newsfilter

Bark Inc (BARK) Shares Surge 19.9% on Acquisition Proposal from Great Dane

Jan 12 2026Benzinga

OceanFirst Financial Corp. Announces $579 Million All-Stock Acquisition of Flushing, Shares Drop 7.4%

Dec 30 2025Benzinga

Eastern International Secures ¥42.5M Contract for 300 MW Solar Project

Dec 24 2025Benzinga

Eastern International Secures $6.04M Contract for 50 MW Photovoltaic Project

Dec 24 2025Newsfilter

ELOG Events

01/26 08:40
Eastern International Subsidiary Wins Wind Farm Project Bids Totaling RMB 91.52M
Eastern International's wholly-owned subsidiary, Guizhou Tianrun, has successfully won the bids for two key construction packages for the Hongze 62.5 MW Wind Farm Project, with the total awarded price of RMB91.52M, or approximately $13.02M. The successful bids for these projects mark the company's official entry into wind power construction sector. The two awarded projects are as follows: Roadworks, lifting platform construction, and land reclamation for the 62.5 MW Wind Farm Project with an award price of RMB79.52M - approximately $11.31M- and Substation Civil Construction Works for the EPC Turnkey Project for the 62.5 MW Wind Farm Project with an award price of RMB12M - approximately $1.71M -. The total award price of the two bid awards is RMB91.52M - approximately $13.02M -.
12/24 08:40
Eastern International Subsidiary Signs $6.04M Solar Project Contract
Eastern International announced that its wholly-owned subsidiary, Guizhou Tianrun Zhicheng Construction Engineering Co., has entered into a construction contract with Weifang Branch of CSCEC Southwest Architecture & Design Institute Design Consulting Co., Ltd. for its Hebei Laiyuan 300 MW Centralized Photovoltaic Power Generation Project. Pursuant to the contract, Guizhou Tianrun will act as a subcontractor and be responsible for the construction of Phase I - 50 MW of the Centralized Photovoltaic Power Generation Project, with a total contract price of $6.04M. Guizhou Tianrun will be responsible for the foundation works, photovoltaic mounting structure installation, photovoltaic module installation, module string wiring, installation and wiring of photovoltaic combiner boxes and supply of certain auxiliary materials. The Project is scheduled to commence for construction before December 31, 2025.
10/27 08:33
Eastern International purchases Guizhou Minji to enhance its presence in power engineering.
Eastern International's wholly owned subsidiary Hangzhou TC-Link has acquired Guizhou Minji Construction and Guizhou Minji has become an indirectly wholly-owned subsidiary of the company. Guizhou Minji holds key industry permits/qualifications for power engineering projects--China's "Grade II Power Engineering Construction General Contracting Qualification," "Grade II Steel Structure Engineering Contracting Qualification," and "Grade II Power Transmission and Transformation Engineering Professional Contracting Qualification." Through this acquisition, Eastern International now possesses the statutory qualifications to independently undertake "power generation projects with individual unit capacity less than or equal to 200 MW", "power transmission and transformation projects up to 220 KV", "10 KV power distribution network projects," as well as same voltage-level new energy, energy storage, and smart grid projects. Additionally, the company can now undertake over 90% of steel structure projects in conventional municipal, industrial, and civil fields.

ELOG Monitor News

Eastern International Ltd Surges After Crossing Above 5-Day SMA

Feb 13 2026

Eastern International Ltd surges 48.59% amid market strength

Dec 24 2025

ELOG Earnings Analysis

No Data

No Data

People Also Watch