Loading...
Access earnings results, analyst expectations, report, slides, earnings call, and transcript.
The earnings call highlights record revenues, strong free cash flow, and increased production across operations, supported by optimistic guidance and effective cost management. The Q&A reinforces management's confidence in meeting production guidance and addressing operational challenges. Exploration results and potential resource conversions add further positive sentiment. The stock price is likely to rise within the 2% to 8% range over the next two weeks.
Second quarter production 137,000 ounces, up 10% from the first quarter, reflecting stronger performances from all three operations.
All-in sustaining costs 18% reduction compared to the first quarter, driven by stronger operational performance, higher grades, and tonnes processed.
Free cash flow $85 million, a significant increase from the first quarter, driven by strong contributions from all three operations.
Revenues $438 million, record revenues due to stronger production, lower costs, and higher gold prices.
Net earnings $159 million or $0.38 per share, including adjustments for unrealized losses and gains.
Adjusted net earnings $144 million or $0.34 per share, excluding unrealized losses and gains.
Operating cash flow $233 million, a record for the second quarter, driven by strong operational performance.
Cash balance $345 million at the end of the second quarter, with total liquidity of $845 million.
Island Gold District production 64,400 ounces, a 9% increase over the first quarter, driven by higher combined milling rates.
Young-Davidson production 38,700 ounces, a 9% increase from the first quarter, with further improvement expected in the second half of the year.
Mulatos District production 34,100 ounces, a 12% increase over the first quarter, reflecting higher grades stacked.
Island Gold District Expansion: The base case life of mine plan for the Island Gold District was released, integrating the Island Gold underground and Magino open pit operations. The plan outlines average annual production of 411,000 ounces at mine site all-in sustaining costs of $915 per ounce over 12 years. An expansion study is underway to evaluate increasing milling rates to 20,000 tonnes per day, potentially supporting higher mining rates and incorporating additional reserves.
Phase 3+ Expansion: The Phase 3+ expansion is progressing well, with the shaft sink at 92% of its planned depth. The expansion is expected to be completed in the second half of 2026, supporting low-cost production growth and free cash flow generation.
Gold Production and Revenue: Second quarter production totaled 137,000 ounces, up 10% from the first quarter. Record revenues of $438 million were achieved, driven by higher gold prices and increased production.
Exploration Success: Exploration drilling extended high-grade mineralization across the Island Gold deposit and other regional targets, highlighting significant potential for additional high-grade mill feed.
Cost Reduction: All-in sustaining costs decreased by 18% compared to the first quarter, with further reductions expected in the second half of the year due to higher grades and increased processing rates.
Operational Efficiencies: The Island Gold mill was shut down, and higher-grade underground ore is now being processed at the Magino mill, realizing significant processing cost synergies.
Free Cash Flow Growth: Free cash flow of $85 million was generated in the quarter, with expectations of exceeding $1 billion annually starting next year, driven by growth projects and higher gold prices.
Long-term Growth Potential: Production is expected to grow to over 900,000 ounces per year by 2028, with potential to reach 1 million ounces annually through further expansion of the Island Gold District.
Cost Guidance Revision: The company revised its 2025 cost guidance, with full-year all-in sustaining costs expected to be 12% higher than originally forecasted. Approximately 40% of this increase is attributed to external factors such as higher-than-budgeted share-based compensation and royalty expenses due to increased gold prices.
Operational Challenges at Young-Davidson: Higher-than-average snowfall and precipitation caused significant groundwater inflow, leading to nearly a week of downtime in May. Additionally, power outages caused by storms impacted mining rates.
Magino Mill Performance: While the Magino mill's performance improved, it is still ramping up to reach its target throughput of 11,200 tonnes per day. This delay could impact production efficiency in the short term.
Gold Prepayment Facility Impact: The company delivered over 12,300 ounces into a gold prepayment facility at a prepaid price of $2,524 per ounce, which is below the average realized price of $3,223 per ounce. This impacts revenue potential.
Expansion and Capital Spending Risks: The Phase 3+ expansion and other growth projects require significant capital investment, with 79% of the $835 million budget already spent or committed. Delays or cost overruns could impact financial performance.
Regulatory and Environmental Risks: Enhanced regional watershed management practices and increased pumping capacity were implemented to address groundwater inflow issues at Young-Davidson. However, such measures indicate potential ongoing environmental and regulatory challenges.
Full Year Production Guidance: The company remains on track to meet its full-year production guidance, with production expected to increase in the second half of the year.
Cost Guidance Revision: Full-year all-in sustaining costs are expected to be 12% higher than the original guidance, with approximately 40% of the increase attributable to external factors. Costs are expected to decline in the second half of the year and continue trending lower over the next several years.
Island Gold District Expansion: The Island Gold District is expected to become one of the largest, lowest-cost, and most profitable gold mines in Canada. An expansion study is underway to evaluate increasing milling rates to 20,000 tonnes per day, with completion expected in Q4 2025. This expansion could incorporate a larger mineral reserve and support higher mining rates.
Phase 3+ Expansion: The Phase 3+ expansion is expected to be completed in the second half of 2026, driving low-cost production growth and free cash flow generation. A larger mill expansion to 20,000 tonnes per day is also being evaluated, with detailed engineering expected to be completed by early 2026.
Free Cash Flow Projections: The company expects strong ongoing free cash flow while funding growth projects. Annual free cash flow is projected to exceed $1 billion starting next year, supported by the completion of the Phase 3+ expansion and other projects.
Lynn Lake Project: The Lynn Lake project is expected to increase consolidated production to over 900,000 ounces per year by 2028, with potential to reach approximately 1 million ounces per year through further expansion of the Island Gold District.
Young-Davidson Operations: Production and costs at Young-Davidson are expected to improve in the second half of the year, with mining rates reaching targeted levels of 8,000 tonnes per day in Q4 2025.
Mulatos District Outlook: The Mulatos District is expected to achieve stronger free cash flow in the second half of the year, driven by higher production and lower costs. PDA development will accelerate in the second half of the year.
Quarterly Dividend: $11 million was distributed as a quarterly dividend in Q2 2025.
Share Buyback: 400,000 shares were repurchased at a cost of $10 million in Q2 2025.
The earnings call highlights record-high revenue and operating cash flow, strong free cash flow, and increased cash balance. Despite a cost guidance revision, the company expects costs to decline. The Q&A section addressed potential risks like seismic activity and capacitor failure, with management providing mitigation measures. The expansion projects and production increases across operations support optimistic guidance. However, the delay in the Island Gold expansion study and Lynn Lake development may raise concerns. Overall, the strong financial performance and optimistic outlook suggest a positive stock price movement.
The earnings call highlights record revenues, strong free cash flow, and increased production across operations, supported by optimistic guidance and effective cost management. The Q&A reinforces management's confidence in meeting production guidance and addressing operational challenges. Exploration results and potential resource conversions add further positive sentiment. The stock price is likely to rise within the 2% to 8% range over the next two weeks.
The earnings call summary reveals several challenges: higher costs, production issues, and equipment availability problems. Despite optimistic free cash flow projections, the current financial performance shows negative free cash flow and higher-than-guided costs. The Q&A section highlights operational challenges and management's reluctance to provide specifics on capital expenditures. While there is potential for shareholder returns, the lack of concrete buyback or dividend plans, combined with production and cost challenges, lead to a negative sentiment. The absence of a market cap makes it difficult to assess volatility, but overall, the sentiment leans negative.
The earnings call reveals several challenges: higher production costs, regulatory and supply chain issues, and market risks, despite a strong cash position and liquidity. The Q&A highlighted concerns about operational risks and unclear guidance on expansion. The lack of a shareholder return plan and the negative free cash flow further contribute to a negative outlook. Although there is potential for future cost reductions, the current financial performance and risks suggest a likely negative stock price reaction in the short term.
All transcripts are sourced directly from the official live webcast or the company’s official investor relations website. We use the exact words spoken during the call with no paraphrasing of the core discussion.
Full verbatim transcripts are typically published within 4–12 hours after the call ends. Same-day availability is guaranteed for all S&P 500 and most mid-cap companies.
No material content is ever changed or summarized in the “Full Transcript” section. We only correct obvious spoken typos (e.g., “um”, “ah”, repeated 10 times”, or clear misspoken ticker symbols) and add speaker names/titles for readability. Every substantive sentence remains 100% as spoken.
When audio quality is poor or multiple speakers talk over each other, we mark the section instead of guessing. This ensures complete accuracy rather than introducing potential errors.
They are generated by a specialized financial-language model trained exclusively on 15+ years of earnings transcripts. The model extracts financial figures, guidance, and tone with 97%+ accuracy and is regularly validated against human analysts. The full raw transcript always remains available for verification.