The earnings call highlights strong financial performance, with increased EBITDA and reduced costs. Positive aspects include improved profitability, a significant share buyback program, and a strong liquidity position. Despite some operational challenges, management remains confident in resolving issues and maintaining guidance. The Q&A reveals no significant negative surprises, and management's confidence in achieving targets is reassuring. Overall, the earnings call suggests a positive sentiment towards the company's outlook, justifying a positive rating.
Adjusted EBITDA $722 million, a 3% increase year-over-year. This improvement was primarily due to profitability from Trail Operations, lower smelter processing charges, and reductions in corporate overhead costs, partially offset by lower copper and zinc prices and higher operating costs at Highland Valley and QB.
Shareholder Returns $487 million returned in Q2 2025 through share buybacks (9.8 million Class B shares). Year-to-date, $1.1 billion has been returned to shareholders through dividends and share buybacks. This reflects elevated daily share buying levels.
Liquidity $8.9 billion in liquidity, including $4.8 billion in cash. This strong balance sheet enables the company to navigate uncertainty and create value.
Copper Production 109,000 tonnes in Q2 2025, similar to the same period last year. Production improved significantly at Highland Valley due to higher grades and mill throughput, while Antamina and Carmen de Andacollo faced challenges such as shutdowns and maintenance.
Net Cash Unit Costs for Copper Improved by $0.14 per pound to $2.02 per pound. This was due to increased byproduct credits, including higher zinc and molybdenum revenue, and lower smelter processing costs.
Zinc Segment Profitability Gross profit before depreciation and amortization increased by 137% to $159 million year-over-year. This was driven by higher byproduct revenues and lower operating costs.
Net Cash Unit Costs for Zinc Decreased by $0.20 per pound to $0.49 per pound, primarily due to lower sulfur processing charges and higher byproduct credits.
Trail Operations Profitability Improved due to an updated operating plan focusing on byproduct production (e.g., silver, germanium) and cost reductions implemented in Q4 2024.
Red Dog Sales 35,100 tonnes in Q2 2025, higher than the guidance range of 25,000 to 35,000 tonnes due to timing of sales.
Corporate Overhead Costs Reduced by 21% year-over-year, reflecting ongoing cost reduction efforts.
Highland Valley Copper Mine Life Extension: The project has been sanctioned for construction, extending the mine's life to 2046 with an average annual copper production of 132,000 tonnes. The capital estimate is CAD 2.1 billion to CAD 2.4 billion, and the project is foundational to doubling copper production by the end of the decade.
QB Optimization and Expansion: Efforts are underway to optimize the mill and explore low-capital debottlenecking opportunities, potentially increasing throughput by 15%-25%. The operation is targeting design rates by year-end.
Copper Growth Strategy: Teck aims to double copper production by the end of the decade, supported by projects like Highland Valley Copper Mine Life Extension, Zafranal in Peru, and San Nicolas in Mexico.
Zinc Segment Performance: Strong performance with a 137% increase in gross profit before depreciation and amortization compared to the same period last year. Red Dog sales exceeded guidance, and Trail operations improved profitability through byproduct revenue increases.
Cost Reductions: Corporate overhead costs reduced by 21%, and operational efficiencies were achieved in Trail operations, including increased byproduct production and cost reductions.
Shareholder Returns: Teck has returned $1.1 billion to shareholders year-to-date through dividends and share buybacks, completing 70% of its $3.25 billion authorized buyback.
Sustainability Recognition: Teck was named one of Corporate Knights' 2025 Best 50 Corporate Citizens in Canada for the 19th consecutive year, highlighting its commitment to sustainability and resource efficiency.
TMF Development Work Delays: The ongoing TMF development work at QB has impacted mill online time and production. Design assumptions for sand dredging rates have proven unachievable, leading to delays and the need for additional measures to improve sand dredging rates and accelerate mechanical movement of sand. This could delay achieving design rates by year-end.
Shiploader Outage at QB's Port Facility: The shiploader outage at QB's port facility is expected to extend into the first half of 2026. While alternative port arrangements have been made, they have led to incremental costs of approximately USD 0.10 per pound, impacting net cash unit costs.
Highland Valley Copper Mine Life Extension Costs: The capital estimate for the Highland Valley Copper Mine Life Extension project has increased to CAD 2.1 billion to CAD 2.4 billion, reflecting inflation, input cost escalation, and additional scope requirements. This could strain financial resources and impact project economics.
Copper Production Risks: Revised annual copper production guidance for QB has been lowered to 210,000 tonnes to 230,000 tonnes due to TMF development delays and potential external factors. This impacts overall copper production and financial performance.
Labor Agreements and Workforce Stability: While labor agreements have been secured at QB and Carmen de Andacollo, any future labor disputes or renegotiations could pose risks to operational stability.
Economic and Regulatory Risks: Potential tariffs on construction materials and regulatory hurdles for projects like the Highland Valley Copper Mine Life Extension and other growth initiatives could increase costs and delay timelines.
Supply Chain and Cost Pressures: Input cost escalation, inflation, and supply chain challenges are impacting project costs and operational expenses, particularly for the Highland Valley Copper Mine Life Extension and QB operations.
QB Copper Production: Revised outlook for QB copper production to 210,000 tonnes to 230,000 tonnes for the year, targeting design rates by year-end. Additional measures are being implemented to improve sand dredging rates and accelerate mechanical movement of sand.
Highland Valley Copper Mine Life Extension: Sanctioned for construction, extending the mine life to 2046 with average annual copper production of 132,000 tonnes. Capital estimate is CAD 2.1 billion to CAD 2.4 billion, with construction mobilization starting in a few weeks.
Copper Growth Strategy: Targeting to double copper production by the end of the decade, with a path to annual copper production of up to 800,000 tonnes through near-term projects and optimizations.
Zafranal and San Nicolas Projects: Progressing as planned, targeting sanction readiness by year-end. Advanced early works initiated for Zafranal, with construction permit expected in Q3. San Nicolas feasibility study to be completed in Q4, with potential sanction decision following necessary permits.
QB Optimization and Debottlenecking: Planning underway to increase throughput by 15% to 25% through mill optimization and low capital debottlenecking opportunities.
Copper Production Guidance: Revised annual copper production guidance to 470,000 tonnes to 525,000 tonnes, with net cash unit costs of USD 1.90 to USD 2.05 per pound.
Cash Returns to Shareholders: Committed to returning between 30% and 100% of future available cash flows to shareholders, with $1 billion remaining in the authorized $3.25 billion buyback program.
Future Copper Projects: All growth projects must meet stringent criteria, delivering attractive risk-adjusted returns and competing for capital in alignment with the capital allocation framework.
Total dividends returned to shareholders year-to-date: $1.1 billion
Base dividends returned in Q2 2025: $61 million
Total share buybacks year-to-date: $1.1 billion
Share buybacks in Q2 2025: $487 million
Percentage of authorized $3.25 billion buyback completed: 70%
The earnings call highlights strong financial performance with increased EBITDA and gross profits in copper and zinc segments. The extension of the Highland Valley mine life and plans to double copper production are positive long-term signals. The Q&A section didn't reveal significant concerns, and the commitment to shareholder returns further supports a positive outlook. Despite some operational risks, the overall sentiment is positive, suggesting a stock price increase in the near term.
The earnings call highlights strong financial performance, with increased EBITDA and reduced costs. Positive aspects include improved profitability, a significant share buyback program, and a strong liquidity position. Despite some operational challenges, management remains confident in resolving issues and maintaining guidance. The Q&A reveals no significant negative surprises, and management's confidence in achieving targets is reassuring. Overall, the earnings call suggests a positive sentiment towards the company's outlook, justifying a positive rating.
The earnings call highlights strong financial performance with significant growth in EBITDA, copper, and zinc profits. The company has a robust cash return plan, with substantial dividends and share buybacks. Despite some operational challenges and vague responses in the Q&A, the overall sentiment is positive due to optimistic guidance, improved cost metrics, and strategic repositioning as a pure-play energy transition metals company. The market is likely to react positively, with a stock price increase in the range of 2% to 8% over the next two weeks.
All transcripts are sourced directly from the official live webcast or the company’s official investor relations website. We use the exact words spoken during the call with no paraphrasing of the core discussion.
Full verbatim transcripts are typically published within 4–12 hours after the call ends. Same-day availability is guaranteed for all S&P 500 and most mid-cap companies.
No material content is ever changed or summarized in the “Full Transcript” section. We only correct obvious spoken typos (e.g., “um”, “ah”, repeated 10 times”, or clear misspoken ticker symbols) and add speaker names/titles for readability. Every substantive sentence remains 100% as spoken.
When audio quality is poor or multiple speakers talk over each other, we mark the section instead of guessing. This ensures complete accuracy rather than introducing potential errors.
They are generated by a specialized financial-language model trained exclusively on 15+ years of earnings transcripts. The model extracts financial figures, guidance, and tone with 97%+ accuracy and is regularly validated against human analysts. The full raw transcript always remains available for verification.