Vizsla Silver Corp. Reports 11 Geotechnical Drill Holes at Panuco Project, Significant Resource Enhancements
Written by Emily J. Thompson, Senior Investment Analyst
Updated: Jan 13 2026
0mins
Source: PRnewswire
- Resource Assessment Progress: Vizsla Silver has completed 11 geotechnical drill holes in the Copala resource area of the Panuco project, validating high-grade continuity with up to 684 g/t AgEq, which is expected to enhance future mining development potential.
- Drilling Plan Expansion: The company plans to continue underground drilling in 2026 to further de-risk and enhance initial mine production, particularly upgrading resources during the first three years of the feasibility study.
- Mining Development Strategy: Vizsla initiated a fully funded test mine and bulk sample program on December 11, 2024, aimed at developing the Morgan ramp and ore extraction from the 460-level, which is expected to provide strategic positions for resource upgrades.
- Technical Report Support: The drilling results will be incorporated into Vizsla's recently announced feasibility study, indicating an annual production of 17.4 million ounces of AgEq over an initial 9.4-year mine life, with an after-tax NPV of $1.8 billion and an IRR of 111%.
Get Free Real-Time Notifications for Any Stock
Monitor tickers like VZLA with instant alerts to capture every critical market movement.
Sign up for free to build your custom watchlist and receive professional-grade stock notifications.
Analyst Views on VZLA
Wall Street analysts forecast VZLA stock price to fall over the next 12 months. According to Wall Street analysts, the average 1-year price target for VZLA is 6.10 USD with a low forecast of 3.95 USD and a high forecast of 7.00 USD. However, analyst price targets are subjective and often lag stock prices, so investors should focus on the objective reasons behind analyst rating changes, which better reflect the company's fundamentals.
4 Analyst Rating
4 Buy
0 Hold
0 Sell
Strong Buy
Current: 6.860
Low
3.95
Averages
6.10
High
7.00
Current: 6.860
Low
3.95
Averages
6.10
High
7.00
About VZLA
Vizsla Silver Corp. is a Canada-based mineral exploration and development company. The Company is focused on advancing its flagship, 100%-owned Panuco silver-gold project located in Sinaloa, Mexico. The Panuco silver-gold project is an emerging high-grade discovery located in southern Sinaloa, Mexico, near the city of Mazatlan. The 7,189.5-hectare, past producing district benefits from over 86 kilometers (km) of total vein extent, 35 km of underground mines, roads, power, and permits. The district contains intermediate to low sulfidation epithermal silver and gold deposits related to siliceous volcanism and crustal extension in the Oligocene and Miocene. The Company also owns the past-producing La Garra-Metates district (the La Garra) situated in the heart of the silver-gold-rich Panuco - San Dimas corridor.
About the author

Emily J. Thompson
Emily J. Thompson, a Chartered Financial Analyst (CFA) with 12 years in investment research, graduated with honors from the Wharton School. Specializing in industrial and technology stocks, she provides in-depth analysis for Intellectia’s earnings and market brief reports.
Vizsla Silver Suspends Activities After Incident at Panuco Project
- Safety Incident Impact: Vizsla Silver's Panuco project site in Mexico experienced a safety incident where 10 individuals were 'taken,' leading to a temporary suspension of certain activities, highlighting the security risks faced by the project.
- Project Progress: Despite the safety incident, Vizsla has transitioned from exploration to development readiness, with first silver production anticipated by 2027, indicating the company's commitment to advancing the project.
- Feasibility Study Findings: The November 2025 feasibility study outlined an initial 9.4-year mine life for the Panuco project, with an average silver equivalent production of 17.4 million ounces per year, reflecting the long-term profitability potential of the project.
- Production Expectations: For the first five years of operation, production is projected to average 20.1 million silver equivalent ounces per year, which not only showcases the project's production capacity but could also positively impact the company's future revenue growth.

Continue Reading
Incident at Vizsla Silver's Concordia Project Site
- Incident Report: Vizsla Silver Corp. reports that ten individuals have been taken from its Concordia project site in Mexico, with the incident currently under investigation, highlighting security risks in the area.
- Crisis Management Response: The company has notified local authorities and activated its crisis management and security response teams, demonstrating its commitment to addressing the situation and ensuring employee safety.
- Activity Suspension: As a precautionary measure, certain activities at and near the site have been temporarily suspended, which may impact the company's production schedule and project timelines.
- Safety Priority: The company's immediate priority is the safety and wellbeing of the individuals involved, reflecting Vizsla Silver's strong focus on employee welfare during crises.

Continue Reading








